AJO ARSR FACILITY HVAC UPGRADE

Replaced 25-Ton air handlers, paired with 10 and 15-Ton condenser units, installed surveillance, bathroom and breakroom overhaul, and water tower installation.

EAST MESA SERVICE BAY COOLER REPLACEMENT

Replaced and relocated bay coolers at East Mesa Service Center.

GLENDATE CITY HALL 4TH FLOOR MECHANICAL EQUIPMENT

Installed Mammoth Unit, terminal VAV’s, and retrofitted existing piping.

HU HU KAM HOSPITAL ARRIVAL EXPERIANCE

Installed air handlers and distribution, exhaust fans, VAV boxes, hose kits, retrofitted pipes, and installed new ductwork.

LUKE AFB AVOINICS BUILDING

Installed EVAPCO Cooling Tower and basin, TACO Pump, and reconfigured condenser water piping.

LUKE AFB BUILDING 998

Installed EVAPCO Cooling Towers and Armstrong Pumps.

LUKE AFB BUILDING 1540 COOLING TOWER

Installed EVAPCO Cooling Tower and retrofitted existing piping.

CITY OF TUCSON ST. AUGUSTINE HVAC PIPIING EXTENSION

Extended existing district underground chilled and heating water piping from the Leo Rich Theater and Tucson Music Hall, to St. Augustine Cathedral Central Plant across Church Ave. Worked through Historically sensitive landscape designed by Garrett Eckbo.

UNI-TECH MECHANICAL BUILDING

Managed design and construction of building, installed HVAC equipment and ductwork, air distribution, and underground plumbing.

US PROBATION OFFICE DUCTWORK AND VAV

Installed terminal units, air distribution, and new ductwork.